Rippa mini excavators, skid steers and attachments for regional Western Australia, with the Perth dealer at Bellevue and freight statewide 1300 263 551 info@rippaaus.com.au
Western Australia · 22 September 2026
Firebreaks

Firebreak Notices Across WA: Deadlines, Widths and the Machine That Does It

Every WA local government issues a firebreak notice under the Bush Fires Act. What they ask for from the Kimberley to Esperance, when they fall due, and how a skid steer or excavator meets them in a morning.

Under section 33 of the Bush Fires Act 1954, every local government in Western Australia can require landowners to install and maintain firebreaks, and almost all of them do. The notice arrives with the rates, and the deadline is usually in November or December.

What the notices ask for

Details vary by shire, but the pattern is:

  • Mineral-earth firebreaks inside boundaries, commonly 3 m wide (some shires 2 m, some more on larger lots), cleared to bare earth.
  • Low-fuel zones around buildings, sheds, haystacks and fuel, typically 20 m, with grass short and dead material removed.
  • Access for fire appliances: driveways clear to a set width and height.
  • Alternatives such as slashed or sprayed breaks, or a variation for erosion-prone slopes, if you apply before the deadline.

Deadlines by region

Region Typical due date
South West, Great Southern, Perth Hills 1 November to 1 December
Wheatbelt 1 November, with harvest bans through summer
Mid West, Gascoyne 1 November to 1 December
Goldfields, Esperance 1 November to 15 December
Pilbara, Kimberley Often before the dry-season fire period, April to June

Read your own notice; the dates and widths in it are the ones that apply.

Bans

On Total Fire Ban days, and during Harvest and Vehicle Movement Bans in the Wheatbelt, using machinery in paddocks and bush is prohibited. Check Emergency WA before starting a machine in grass from November on.

The machines and attachments

Skid steer with a brush cutter for slashing low-fuel zones and slashed breaks; the fastest way to meet the notice on a lifestyle block. Skid steer with a 4-in-1 bucket or dozer blade to scrape a bare-earth break and grade it. Excavator with a rake for steep or rocky ground and for windrowing debris, and a grapple for fallen timber.

Method for a bare-earth break

  1. Mark the line at the required offset and locate services.
  2. Slash first if the grass is long.
  3. Scrape 50 to 100 mm only, blade flat; deep scraping causes erosion.
  4. Windrow the spoil inside the break and remove or spread it.
  5. Check the width at the corners with a tape.
  6. Maintain after regrowth.

Timing

Do it in spring while grass is green and the ground is soft; touch up before the deadline. In the north, do it at the end of the wet.

See the attachment finder for brush cutters, buckets and rakes by model, and the WA region pages for your district.

Talk to Rippa Australia

Get a freight-inclusive quote for your region

Rippa Australia quotes every machine with freight to your WA address, or you can collect from Rippa Perth in Bellevue.

Call 1300 263 551Quote Now